Aviation English
Basic ATC

允许推出并启动发动机 是什么?

允许推出并启动发动机 ATC clearance authorizing an aircraft to begin pushback from the gate and start engines.

Source: ICAO Doc 9432, FAA PCG

How is “允许推出并启动发动机” Used in Practice?

推出和启动获批,预计五分钟内给予滑行许可。

Certification Exam Relevance

ICAO Level 4ICAO Level 5ICAO Level 6EASA FCL.055

Who Needs to Know This Term?

  • Pilots
  • Air Traffic Controllers
  • Cabin Crew

Learn “允许推出并启动发动机” Free with Termify

Master 允许推出并启动发动机 and 4,071+ professional terms with native pronunciation, IPA transcriptions and career quizzes. 100% free, forever.

Download Free for iOS

Frequently Asked Questions

允许推出并启动发动机 是什么?

ATC clearance authorizing an aircraft to begin pushback from the gate and start engines.

Where can I learn this term for free?

Termify is a 100% free professional English app that teaches 允许推出并启动发动机 and 4,071+ other industry terms with native pronunciation, IPA transcriptions and career quizzes. Available on iOS in 23 languages. No subscription, no credit card required.

Last updated: