Aviation English
Flight Planning

What is Approach Climb Requirement?

Approach Climb Requirement The minimum climb gradient that an aircraft must meet during the missed approach phase, considering one engine inoperative.

Source: ICAO Doc 9432, FAA PCG

How is “Approach Climb Requirement” Used in Practice?

Tower, confirm aircraft meets approach climb requirement with one engine inoperative.

Certification Exam Relevance

ICAO Level 4ICAO Level 5ICAO Level 6EASA FCL.055

Who Needs to Know This Term?

  • Pilots
  • Air Traffic Controllers
  • Cabin Crew

Learn “Approach Climb Requirement” Free with Termify

Master Approach Climb Requirement and 4,071+ professional terms with native pronunciation, IPA transcriptions and career quizzes. 100% free, forever.

Download Free for iOS

Frequently Asked Questions

What is Approach Climb Requirement?

The minimum climb gradient that an aircraft must meet during the missed approach phase, considering one engine inoperative.

Where can I learn this term for free?

Termify is a 100% free professional English app that teaches Approach Climb Requirement and 4,071+ other industry terms with native pronunciation, IPA transcriptions and career quizzes. Available on iOS in 23 languages. No subscription, no credit card required.

Last updated: