Aviation English
MEL and CDL MEL and CDL

ما هو نشرة الخدمة معلقة؟

نشرة الخدمة معلقة Manufacturer’s recommended modification or inspection not yet incorporated; outstanding action listed in maintenance records.

Source: ICAO Doc 9432, FAA PCG

How is “نشرة الخدمة معلقة” Used in Practice?

تظهر السجلات الفنية للطائرة نشرة الخدمة معلقة لفحص روابط جذر الجناح؛ التنفيذ في الفحص القادم.

Certification Exam Relevance

ICAO Level 4ICAO Level 5ICAO Level 6EASA FCL.055

Who Needs to Know This Term?

  • Pilots
  • Air Traffic Controllers
  • Cabin Crew

Learn “نشرة الخدمة معلقة” Free with Termify

Master نشرة الخدمة معلقة and 4,071+ professional terms with native pronunciation, IPA transcriptions and career quizzes. 100% free, forever.

Download Free for iOS

Frequently Asked Questions

ما هو نشرة الخدمة معلقة؟

Manufacturer’s recommended modification or inspection not yet incorporated; outstanding action listed in maintenance records.

Where can I learn this term for free?

Termify is a 100% free professional English app that teaches نشرة الخدمة معلقة and 4,071+ other industry terms with native pronunciation, IPA transcriptions and career quizzes. Available on iOS in 23 languages. No subscription, no credit card required.

Last updated: